Over years of preparing R&D claims and supporting clients through HMRC enquiries, certain patterns emerge. Some mistakes appear repeatedly across different companies and sectors. Understanding these common pitfalls helps you prepare stronger claims and avoid unnecessary complications.

This article identifies the most frequent errors we see, explains why they occur, and provides practical guidance on how to avoid them.

Common Mistakes in R&D Claims and How to Avoid Them

Mistake 1: Claiming Routine Development as R&D

The Error

Companies claim costs for work that uses established technologies and methods, even when implemented skillfully. The work may be complex and time-consuming, but if the solution was known from the outset, it doesn’t meet HMRC’s definition of R&D.

Why It Happens

Teams genuinely find the work challenging. From an internal perspective, it feels like significant development effort. However, difficulty alone doesn’t create R&D—genuine technical uncertainty must exist.

How to Avoid It

Ask:

  • Could a competent professional in your field readily achieve this result?
  • Are you following established patterns, or resolving genuine unknowns?
  • If you hired an expert, would they still face uncertainty, or just need time?

Mistake 2: Vague Technical Narratives

The Error

Claims describe work in general terms: “improved performance,” “enhanced functionality,” “resolved technical challenges.” These statements don’t explain what specific uncertainties existed or how they were addressed.

Why It Happens

Technical teams know what they did but struggle to articulate it in HMRC’s framework. Generic descriptions feel sufficient internally but don’t demonstrate compliance with the R&D definition.

How to Avoid It

Be specific:

Instead of: “We improved database performance.”

Write: “We faced uncertainty about whether query response times under 100ms could be achieved for datasets exceeding 10TB. Existing indexing approaches introduced unacceptable latency. We investigated three novel indexing strategies, tested performance under load, and developed a hybrid approach combining sparse indexing with predictive caching.”

Mistake 3: Overclaiming Staff Time

The Error

Companies claim 100% of developers’ time as R&D, or allocate unrealistically high percentages to qualifying work. HMRC recognizes that most roles involve routine tasks alongside R&D activities.

Why It Happens

Without detailed time tracking, estimates become optimistic. Companies assume that because someone works on an R&D project, all their time qualifies. This ignores meetings, administration, routine maintenance, and non-qualifying development work.

How to Avoid It

  • Track time contemporaneously where possible
  • Apply realistic allocations based on actual activities
  • Separate qualifying R&D work from routine implementation
  • Document how percentages were calculated

Mistake 4: Poor Documentation

The Error

Claims lack supporting evidence. When HMRC asks for documentation, companies struggle to produce contemporaneous records demonstrating the systematic nature of their work or the uncertainties they faced.

Why It Happens

Technical teams focus on delivery, not documentation. Recording R&D activities feels like additional bureaucracy. By claim time, memories have faded and records must be reconstructed.

How to Avoid It

  • Maintain project documentation throughout development
  • Keep meeting notes that reference technical decisions
  • Use version control commits to demonstrate iterations
  • Document test results and experimental findings
  • Create a simple template for capturing R&D work as it happens

Mistake 5: Misunderstanding Scheme Eligibility

The Error

Companies claim under the wrong scheme—using SME rates when they should use RDEC, or assuming the Merged Scheme applies when they don’t meet the R&D intensity test.

Why It Happens

The rules have changed multiple times. Companies that claimed under SME historically assume they still qualify. The introduction of the 30% intensity test from April 2024 caught many businesses off guard.

How to Avoid It

  • Verify your accounting period start date
  • Calculate your R&D intensity if you’re an SME claiming from April 2024 onwards
  • Check whether your work is subcontracted or subsidized
  • Don’t assume the rules that applied last year still apply now

Mistake 6: Missing the Notification Deadline

The Error

Companies fail to notify HMRC within six months of accounting period end. HMRC refuses the claim entirely, regardless of whether the R&D was legitimate.

Why It Happens

Businesses are unaware the requirement exists, especially if they haven’t claimed before. The deadline feels abstract when the actual claim submission is two years away.

How to Avoid It

  • Mark the six-month deadline immediately after period end
  • Submit notification early (don’t wait until month six)
  • Verify whether you’re exempt (established claimants don’t need to notify)
  • Keep confirmation of submission for your records

Mistake 7: Claiming Ineligible Costs

The Error

Companies include costs that don’t qualify: rent, overheads, marketing, sales activities, or general administration. Some also claim subcontractor costs under schemes where they’re no longer eligible.

How to Avoid It

  • Understand which cost categories qualify under your specific scheme
  • Only include direct costs related to R&D activities
  • Be aware that subcontractor costs are generally excluded under RDEC and Merged Scheme
  • Distinguish between EPWs (65% qualifying) and subcontractors (usually non-qualifying)

Mistake 8: Claiming Non-R&D Innovation

The Error

Companies claim for innovative business processes, creative design work, market research, or service improvements that don’t involve scientific or technological advance.

How to Avoid It

Remember that R&D for tax purposes requires an advance in science or technology, not just innovation. Ask: is this a scientific/technological challenge, or a business/creative one?

Mistake 9: Inconsistent Information

The Error

Different parts of the claim contradict each other. The technical narrative describes one set of activities, but cost allocations suggest different work was done.

How to Avoid It

  • Review the entire claim for consistency
  • Ensure technical descriptions align with cost categories
  • Have someone independent review before submission

Mistake 10: Failing to Learn from Past Claims

The Error

Companies repeat the same errors year after year, especially if previous claims weren’t reviewed carefully or if lessons from enquiries weren’t applied.

How to Avoid It

  • Review what worked well in previous claims
  • If HMRC raised questions, address those areas proactively next time
  • Improve documentation practices based on experience
  • Build institutional knowledge about what qualifies

The Cost of Mistakes

These errors create several risks:

  • HMRC enquiries that absorb management time
  • Reduced claim values when costs are disallowed
  • Potential penalties for careless or deliberate errors
  • Damage to relationship with HMRC affecting future claims
  • Lost credibility with investors or board members

Getting It Right

Avoiding these common mistakes requires understanding HMRC’s requirements, maintaining good documentation practices, and applying realistic assessments of what qualifies. The investment in doing this properly pays off through smoother claims, fewer enquiries, and better outcomes.

At Bahri & Bahri, we’ve seen these patterns repeatedly and help clients avoid them through careful claim preparation, realistic eligibility assessment, and attention to HMRC’s evolving expectations.

About Bahri & Bahri

Bahri & Bahri support companies in preparing accurate, well-evidenced R&D claims that avoid common pitfalls. Our compliance-focused approach helps clients access the relief they’re entitled to while minimizing risk.

Contact: info@bahriandbahri.com | www.bahriandbahri.com